
Manure bag
Features
- Lower drainage with measuring well
- Height: standard 2.5 and 3.5 meters, but can be produced in any size
- Acid and fertilizer resistant
- Inspection opening
- Low maintenance
- 4 venting points
- Weighted PVC fabric of 1,150 gr / m²
Easy to (re) install, even on soft surfaces. Low maintenance. Reference period 10 years, according to BRL 2344
- Standard equipped with filling / removal station 6 ”
- Bank protection 300gr / m²
- Wooden or steel fencing
- Concrete culvert with ø 315 mm pipes
- According to BRM-BRL and HBRM regulations

Manure bag
Assembly
An excavator digs the soil and sets up the embankments in accordance with the construction drawings. In principle, all excavated soil is used for the embankments. From the center of the basin, a 200 mm fill / take-off pipe is installed to the outside of the basin. The take-off station, the spill pit and the main shut-off valve are installed here. After the pipework, the slope will be closed again.
The manure bag is placed in the middle with a crane and rolled out and unfolded in all directions.
The bag is secured with anchoring posts in the slope to prevent it from shifting. The whole is protected with slope protection to prevent weeds and vermin
